一区爱色在线观看_2020精品久久久久久中文字幕_欧美做暖暖视频在线观看_日韩AV操嫩b_又黄又爽无遮拦_黄色亚洲性爱视频_外网av在线看_久操国产中文字幕在线_cao91.福利在线_精品少妇无码一区二区三区粉嫩车模_免费黄片代码网站_性爱福利电影_日韩人妻中文字母在线_免费在线强奸视频_成人夜晚视频网站

CISDIFlex UHP DC EAF’s flexible power supply wins high praise

Date:2024/7/31 Source: CISDI

CISDI has channeled its power electronics research and development strengths into creating a game-changing flexible power supply unit.

The CISDIFlex is dedicated to an ultra-high-power DC electric arc furnace which is at the core of a Mini-mill and is charged with scraps for melting.

The Mini-mill is now a greener development trend in the global steel sector. Its energy consumption and carbon emissions are two thirds less than integrated mills with blast furnaces and basic oxygen furnaces at their core.

Scrap is a renewable energy source which can be recycled infinitely. To produce one tonne of billet from scrap can reduce 1.6 tonnes of carbon dioxide emissions and three tonnes of solid waste emissions.

CISDIFlex applies the latest insulate-gate bipolar transistor components and features pure-water cooling, modular design and fully-digital control.

It enables flexible, continuous regulation of current and voltage and solves problems such as large grid impact, inferior regulation of output voltage and current and the risk of poor impact resistance posed by the conventional thyristor DC power supply.

Nine patents have been applied for and CISDIFlex is already the winner of China’s Innovation Methods Contest.

Projects where CISDIFlex has been applied are demonstrating smart control against slip’s short-circuiting and arcing restarts.

 

 

The patent-pending CISDIFlex

 

  CISDIFlex at Pangang Changcheng Special Steel, Sichuan

December 2021 saw CISDI-SuperARC EAF’s hot commissioning at Pangang Changcheng Special Steel in China’s Sichuan Province. Power is supplied to the SuperARC by CISDIFlex and the result is stable liquid steel tapping throughout the entire melting process.

World-class technical indicators have been achieved:

Power output’s response speed: 0.1 millisecond;

Grid-side power factor: > 0.95;

Voltage and current fluctuation: < 3%;

Power supply’s overall loss: within 3%;

Power consumption saved: 10%.

 

The CISDIFlex working at Changcheng’s SuperARC

 

 

Tapping in process at Changcheng’s SuperARC


CISDIFlex at Yuxi Xianfu Steel, Yunnan

The world’s first CISDI-SuperARC EAF went operational at Yuxi Xianfu Steel in China’s Yunnan Province in August 2023.

The vessel’s capacity for alloy steel melting is 52 tonnes.

Xianfu’s CISDIFlex ranks as the largest in China for a single furnace, indicating a rated power of 58MW and a rated working current of 116kA.

Yuxi Xianfu Steel is rightly proud of its SuperARC, which is achieving world-leading performance indicators, product standards and operational reliability.

 

The CISDIFlex serving Xianfu’s SuperARC

 

 

  

CISDI’s expert team was onsite for CISDIFlex’s assembly and testing

 

 

Tapping in process at Xianfu’s SuperARC